The relevance of SAP PM ERP is increasingly growing among manufacturing plant owners, which has led to a surge in demand for qualified SAP PM consultants. Numerous big organizations now rely on SAP to streamline their business processes and attain optimal productivity and profitability. Becoming an SAP PM consultant demands a few things, such as skills and the prowess to handle the software. Apart from that getting through an interview is one crucial step. We have come up with the most relevant SAP PM Interview Questions and Answers to help professionals get a solid grasp of what they can expect in an interview.
We shall discuss at length the numerous SAP PM Interview Questions with sample answers to give you a comprehensive idea of how to respond to a particular question. We will categorize the SAP Plant Maintenance Questions based on experience level to give better clarity.
If you are looking for sample SAP PM Interview Questions and Answers to better prepare yourself for a job interview, here is your comprehensive guide. Let's get on to it.
The ERP SAP Plant Maintenance is the application component that provides the organization with a comprehensive software solution that concerns the organization's maintenance activities. This platform allows complete interconnectivity of all the functions and data of the maintenance procedure that are performed within a company. The PM Module is designed by integrating user-friendly- uniform graphical UI and several other features tailored to meet individual requirements. The SAP PM's openness feature allows the use of external systems integrated with the component like GIS ( Geographical Information Systems) CAD systems ( Computer-aided Design)and SCADA systems (supervisory control and data acquisition). The module is also intertwined with other SAP modules like Sales and Delivery (SD), Production Planning, and Inventory (IC) Control.
Breakdown Maintenance in SAP PM is the process of solving a malfunction or a breakdown in some of the equipment that demands a reaction from repair service. Breakdown Maintenance is significantly demanded in the following situation:
When the equipment fails to function properly
When technical equipment malfunctions affect production
Creating an M2 malfunction notification, and PM02 order-type equipment is resolved at the site. Codes and catalogs in the notification are employed in breakdown maintenance.
CATS means Cross-Application Time sheet. It is a tool applied for monitoring working time and activities in Plant Management. The tool powers users to control all business processes regarding employee tasks such as paying the employees, tracking project progress and creating invoices, etc.
The Inventory component in SAP PM is assigned the service contract. The equipment material is determined by the equipment leader. However,
it does not entail controlling of the equipment acquired from suppliers, where utility offering takes place instead of the operation.
The functional location structure indicator is unique across clients and not across the system.
In such an event, the plant reference number must be used as the first level of the structure of the functional location.
Outline the menu path to display the structure of a functional location in list form and as a Graphic.
Plant maintenance->Technical Objects->Functional Location->Structural display
Chemical Process
Energy (power station)
Property Management
Transport
Steelworks
Production line
The mandatory steps include:
Activate alternative labeling
Indicators for the primary labels
A labeling system may be defined by creating a new structure indicator
Activate alternative labeling
Define labeling systems for functional locations
Enter label internal view
Plant maintenance->technical objects->functional location->labels->user profile.
The functions determined by Functional Locations include:
Change documents
Status profile
Asset, object information key
Partner determination
Measuring point category.
The core activities of SAP Plant Maintenance include:
Inspection: for measuring and establishing the actual condition of a technical system
Preventive Maintenance: For measuring and maintaining the technical system's ideal condition
Repair: For measuring and restoring the technical system's ideal state
Other modules in SAP such as Material Management, Sales and Distribution, Personnel Management, Production, and Controlling, are in close integration with SAP PM.
We have discussed some of the most important SAP Plant Maintenance Questions for beginners. Let us now delve into SAP PM Interview Questions that are typically more suited for experienced professionals.
The equipment Master is concerned with one of the master data element within the Operations and Maintenance domain or - The SAP module of Plant Maintenance.
Equipment is an individual business object that requires independent maintenance. This physical object is installable in a technical system or even in a part of a technical system. All sorts of devices can be managed as "piece of equipment", for instance-
Production utilities
Transportation utilities
Test equipment
Production resources/tools
Buildings
PCs.
This depends on the Equipment. Essentially, the fields employed for maintenance in an Equipment master include:
Equipment Category
Construction type (serialized)
Planning Plant
Work center
Plant
Maintenance plant
Location
Equipment can be attached to another by using a superior Equipment field.
The Steps are:
Maintenance and Service Processing
Maintenance and Service Notification
Notification Creation
Notification types
Allowed change of notification type
Program's Technical guidelines
Company of the Maintenance Division
Task Category
Employee performance and expertise
The process does not involve the standard system. It can be carried out by employing ABAP batch jobs.
Maintenance history is only traceable at the level where the maintenance orders are created for FL/Equipment only and not at the assembly level. Assemblies are simply the structuring of devices to make spare parts linked to equipment structurally. However, in Plant Management orders, the assembly can be mentioned along with the FL/Eq. As per the reporting needs, ABAPer can use the PM assembly field in Plant management orders.
"Standing order" is used to execute ongoing maintenance jobs and settle them by month-end regularly and do away with continuously creating fresh Plant Maintenance orders. By employing order hierarchies, sub-orders could be attached to the standing order and settled to the standing order to attain a more precise recording of the maintenance cost at the sub-order level along with budget monitoring at the standing order level.
The following list is some of the integration points
Batch Managed material as Equipment -Material master record
Maintenance order- Reservations and Goods Issue
Material valuation class or types for refurbishment materials as equipment
Triggering PR from Maintenance Order
Equipment Master Data Asset/Sub-Asset numbering
Activity-based costing for Operations run via Maintenance Order
Maintenance Order Settlement of accrued costs to G/L Account, Cost Center, Asset, etc.,
Although industries vary, there are four distinct user groups that benefit the most from SAP PM. They are:
Operation and maintenance managers: SAP MM is highly useful in theri task of monitoring and tracking equipment performance and maintenance requests
Maintenance technicians: Massively support in improving maintenance efficiency.
Production line employees: Significantly helps them in proactively tracking maintenance issues to prevent them from impacting production.
Purchasing departments: PM is highly useful in purchasing spares and scheduling services, which ultimately reduces downtime proactively.
Milestone confirmation is one of the four special confirmations SAP PM uses for documenting the processing status of orders, operations, and capacities. The other three are progress, summary, and standard.
In a Milestone confirmation, one order or operation causes automatic confirmation of other corresponding suboperations. For Instance, If Operation A's control key is marked as a Milestone operation, Operation B- a suboperation of A results in automatic confirmation along with A's confirmation.
Structuring aids in organizing systems based on the available objects.
This is one of the most common SAP PM interview questions checking to assess your knowledge of the benefits of Structiring and its optimal application. The right structuration entails minimizing the time required for managing technical objects. It also helps in simplifying maintenance processing and the requisite time for spending on it. Lastly, an optimal structure facilitates quicker and more thorough maintenance data evaluation.
This is another top SAP PM interview question raised to evaluate the candidate's working knowledge of the varied features of SAP PM. Yes, the equipment category is changeable. The first step required to do is Run "t code IE02", followed by entering the corresponding equipment number. Upon the loading of the equipment's main screen, the user can navigate to the edit menu and choose "change category." Then, the user may enter the new category and click refresh to complete the action.
This is among the top asked SAP Plant Maintenance Interview questions to assess a candidate's in-depth knowledge. Candidates can simply frame their answer by explaining each maintenance type feature and also highlighting the variations between them stating examples.
Corrective Maintenance: This enhances the equipment's or machine's working condition. For instance, A technician identifies a malfunction during a routine check-up, and to rectify it, corrective work is executed.
Preventive maintenance entails the team performing routine checks to guarantee that the equipment works in conformation with the required parameters. The order type for this is PM01.
Breakdown Maintenance: It entails technicians executing breakdown maintenance in the event of equipment not working or malfunctioning or a breakdown. The order type is PM02
Technicians execute a breakdown maintenance order after the equipment has a breakdown and is not working. Its order type is PM03.
This SAP PM interview question needs candidates to respond in two -parts. First giving the key definition that validates your knowledge of several counter plans. The other part is to give a straightforward explanation of your experience using it.
Essentially Multiple counter plans are utilized in performance-based maintenance tasks. Several maintenance cycles can be created and allocated functional positions or equipment counters with varying dimensions for each cycle.
In response to the second part of the question, you may begin by explaining the role you held and the industry you worked for. Explain which aspect of the industry demanded multiple counter plans and explain the process you integrated into accomplishing the task.
Refurbishment entails repairing spares and moving them to the warehouse. During the refurbishment period, the damaged equipment can be uninstalled and moved to the warehouse by applying order movement type 101.
The steps involved in the process of Refurbishment are:
Uninstalling the damaged part out of the maintenance plant
Use Movement type 101 for moving the damaged equipment to the warehouse
Creating a refurbishment order for calculating refurbishment cost
Once complete, the material transforms to refurbished from Damaged
Reinstalling the equipment in the maintenance plant
That's about it on the top SAP PM Interview Questions and Answers that candidates might find useful in their upcoming interviews. You may find this article as a comprehensive guide to preparing for your SAP PM interview.